Facility: Booster compressor station at the complex gas treatment plant (UKPG-11B) of the Yen-Yakhinsky oil, gas and condensate field (OGCF).
Customer: PJSC Gazprom, 2021.
Facility: Development of the Kovyktinskoye gas and condensate field. Stage 4.
Customer: PJSC Gazprom, 2021.
Facility: Development of the Kovyktinskoye gas and condensate field. Stage 5. Facilities of the complex gas treatment plant (UKPG-2), including production wells, condensate piping, condensate offloading terminal to Okunaisky settlement, central booster compressor station.
Customer: PJSC Gazprom, 2021.
Facility: Power of Siberia gas pipeline.
Customer: PJSC Gazprom, 2021.
Facility: Main rail tracks III and IV Moscow-Passenger Station-Kurskaya Station – Moscow-Kalanchyovskaya Station (Moscow – Kazan Section of Moscow-Kazan-Yekaterinburg High-Speed Railway (stages 1 and 2).
Customer: OJSC Russian Railways
Facility: Modification of the onshore processing facilities of the Kirinskoye gas condensate field (GCF).
Customer: PJSC Gazprom / RusGasShelf LLC
Facility: Power of Siberia gas pipeline. Kovykta – Chayanda section. Linear pipeline.
Customer: PJSC Gazprom / RusGasShelf LLC
Facility: Modernization of the production facility of Bakyrchik Mining Venture LLP.
Customer: Bakyrchik Mining Venture LLP (Kazakhstan)
Facility: Development of the Kirinskoye gas condensate field (GCF).
Customer: PJSC Gazprom
Facility: Copper Plant of Polar Division.
Customer: PJSC MMC Norilsk Nickel
Facility: Booster compressor station at the complex gas treatment plant (UKPG-1C) of the Zapolyarnoye oil, gas and condensate field (OGCF).
Customer: PJSC Gazprom
Facility: Booster compressor station at the complex gas treatment plants (UKPG-5B and UKPG-2B) of the Urengoyskoye oil, gas and condensate field (OGCF) of phase 2.
Customer: PJSC Gazprom
Facility: Nuclear Power Plant, Rooppur, Bangladesh
Customer: The Civil Engineers Limited, Bangladesh
Facility: JSC VNIIRA (Federal Scientific Production Center All-Russian Scientific Research Institute of Radio Equipment awarded with the Order of Red Banner), Saint Petersburg.
Customer: JSC VNIIRA ("Almaz–Antey" Air and Space Defence Corporation, JSC)
Facility: Substation PS 110 kV Pashino in Novosibirsk.
Customer: Piterenergomash LLC
Facility: Installation of process, crane utility systems in the hull production workshop of Zvezda Shipbuilding Complex, LLC, Vladivostok.
Customer: Zvezda Shipbuilding Complex, LLC
Facility: St. Petersburg Metro SUE
Customer: JSC Systems and Technologies Group
Facility: Development of Achimovsky deposits of the Urengoyskoye oil, gas and condensate field (OGCF).
Customer: JSC Achimgaz
Facility: Construction of a floating nuclear heat and power plant based on the floating power unit with reactor facilities KLT-400 in Pevek, Chukotka Autonomous Okrug.
Customer: JSC Rosenergoatom
Facility: Booster compressor station of the Ety-Purovsky gas field
Customer: PJSC Gazprom
Facility: Development of Cenomanian-Aptian deposits of the Kharasaveyskoye gas condensate field (GCF).
Customer: PJSC Gazprom
Facility: Development of gas transmission capacity of the unified gas supply system of Northwestern Region, Gryazovets – CS Slavyanskaya section.
Customer: PJSC Gazprom
Booster compressor station at the complex gas treatment plant (UKPG-1B) of the Yamburgskoye oil, gas and condensate field (OGCF) of phase 2.
Customer: PJSC Gazprom
Relocation of underground utility systems due to the construction of new facilities within the project “Modernization and expansion of production lines of JSC Mondi Syktyvkar Pulp and Paper Mill “Horizont”.
Customer: JSC Mondi Syktyvkar Pulp and Paper Mill
Facility: Ukhta – Torzhok gas pipeline system.
Customer: PJSC Gazprom
Facility: Leningrad Oblast, Tosno municipal district, Fedorovskoye rural settlement, Annolovo village, Industrial estate “IndustryPark” “Fedorovskoye”, 2nd Vertikalny Proezd, Section 5 (Routing of external power supply cables 0.4 kV of the plastic packaging production plant building).
Customer: LLC Finprom Inzhenernye Seti
Facility: Bovanenkovo – Ukhta gas trunkline system.
Customer: PJSC Gazprom
Facility: Development of the Trebs and Titov oil fields.
Customer: Bashneft-Polus LLC
Facility: Kozmino Port, Nakhodka.
Customer: Makrus LLC
Facility: St. Petersburg Metro SUE.
Customer: St. Petersburg State Public Institution “Directorate of Transport Construction”
Facility: Domodedovo Airport.
Customer: AE ARMA-ELECTROPANC
Facility: Compressor station Portovaya.
Customer: PJSC Gazprom
Facility: Kaliningrad underground gas storage facility.
Customer: PJSC Gazprom
Facility: SIBUR-Portenergo complex.
Customer: PJSC SIBUR Holding
Facility: Plesetsk launch base.
Customer: FSUE Administration for Special Construction of Russia (Spetsstroy)
Facility: Western High-Speed Diameter, St. Petersburg.
Customer: Northern Capital Highway, LLC